Our kitchen cabinets and countertops have been installed.
Monday, March 29, 2010
Wednesday, March 24, 2010
Concrete forms, interior paint and flooring
Today's first picture shows the forms in place for the driveway, front entry walk and read grill pad.
Tiles flooring are in place - this is the kitchen area.
The guest bath tiles are in complete with a glass block window.
Tiles flooring are in place - this is the kitchen area.
The guest bath tiles are in complete with a glass block window.
Thursday, March 18, 2010
The siding is on
The exterior siding has now been installed and the trim is largely in place. It's starting to look like a home!
Saturday, March 13, 2010
The sheet-rock is up
The entire interior has been sheet-rocked and looks prepped for painting. This picture is looking from the living room toward the front door and kitchen. The dining area is on the right by the kitchen pass-through.
Tuesday, March 9, 2010
The roof is on and windows are in
The house is now under roof and more-or-less weatherproofed. The sides have been insulated and the windows are all in place.
Friday, March 5, 2010
It's going up fast!!
This isn't Extreme Makeover Home Edition, but our house in going up like crazy! At left is the two-car garage with the kitchen nook next to it. The ladder is by the front entrance with a bay window bedroom on the right.
The second picture is of the back with the other guest bedroom on the left, the 9' x 20' screened lanai and the master bedroom on the right.
The second picture is of the back with the other guest bedroom on the left, the 9' x 20' screened lanai and the master bedroom on the right.
Wednesday, March 3, 2010
The building material is here
With the foundation poured and drying, the roof trusses, wall lumber and sidewall materials are being delivered.
Tuesday, March 2, 2010