Monday, March 29, 2010

Kitchen cabinets and carpet

Our kitchen cabinets and countertops have been installed.

Wednesday, March 24, 2010

Concrete forms, interior paint and flooring

Today's first picture shows the forms in place for the driveway, front entry walk and read grill pad.
Tiles flooring are in place - this is the kitchen area.
The guest bath tiles are in complete with a glass block window.

Thursday, March 18, 2010

The siding is on

The exterior siding has now been installed and the trim is largely in place. It's starting to look like a home!

Saturday, March 13, 2010

The sheet-rock is up

The entire interior has been sheet-rocked and looks prepped for painting. This picture is looking from the living room toward the front door and kitchen. The dining area is on the right by the kitchen pass-through.

Tuesday, March 9, 2010

The roof is on and windows are in

The house is now under roof and more-or-less weatherproofed. The sides have been insulated and the windows are all in place.

Friday, March 5, 2010

It's going up fast!!

This isn't Extreme Makeover Home Edition, but our house in going up like crazy! At left is the two-car garage with the kitchen nook next to it. The ladder is by the front entrance with a bay window bedroom on the right.


The second picture is of the back with the other guest bedroom on the left, the 9' x 20' screened lanai and the master bedroom on the right.

Wednesday, March 3, 2010

The building material is here

With the foundation poured and drying, the roof trusses, wall lumber and sidewall materials are being delivered.

Tuesday, March 2, 2010

Pour that concrete!

The concrete flooring is going in and being smoothed out.