Work was finished on our new home this past week and it is now ready for closing next week. It looks like I'll need to shop for a new lawnmower... We can't believe it, but we'll be moving in on May 4th.
Friday, April 16, 2010
Sunday, April 4, 2010
Location and layout
Here is a map of The Villages, FL (you can click on it to zoom in for more details). Our new home is located near the pointer at the bottom of this picture. The pinkish area at the pointer is the Village of Hemingway and you can see the two golf courses (called Kilimanjaro and Roosevelt) that surround us on either side in green. Directly above us (in orange) is the Hemingway Neighborhood Pool. Ahhh...
Here is the basic floor plan for our new home. A few interesting points are the utility room (just below the master bedroom), the huge walk-in closet in the upper left corner and the walk-in shower in the master bath.
Here is the basic floor plan for our new home. A few interesting points are the utility room (just below the master bedroom), the huge walk-in closet in the upper left corner and the walk-in shower in the master bath.
Friday, April 2, 2010
Landscaping, appliances, sod and more
The driveway and walks have been poured and the landscaping is now in place. We have a baby palm tree!
The front door has been painted (we love the glass).
The kitchen appliances are in and the kitchen looks to be done.
The walk-in shower is done.
...and the sod is being laid.
The front door has been painted (we love the glass).
The kitchen appliances are in and the kitchen looks to be done.
The walk-in shower is done.
...and the sod is being laid.
Monday, March 29, 2010
Wednesday, March 24, 2010
Concrete forms, interior paint and flooring
Today's first picture shows the forms in place for the driveway, front entry walk and read grill pad.
Tiles flooring are in place - this is the kitchen area.
The guest bath tiles are in complete with a glass block window.
Tiles flooring are in place - this is the kitchen area.
The guest bath tiles are in complete with a glass block window.
Thursday, March 18, 2010
The siding is on
The exterior siding has now been installed and the trim is largely in place. It's starting to look like a home!
Saturday, March 13, 2010
The sheet-rock is up
The entire interior has been sheet-rocked and looks prepped for painting. This picture is looking from the living room toward the front door and kitchen. The dining area is on the right by the kitchen pass-through.
Tuesday, March 9, 2010
The roof is on and windows are in
The house is now under roof and more-or-less weatherproofed. The sides have been insulated and the windows are all in place.
Friday, March 5, 2010
It's going up fast!!
This isn't Extreme Makeover Home Edition, but our house in going up like crazy! At left is the two-car garage with the kitchen nook next to it. The ladder is by the front entrance with a bay window bedroom on the right.
The second picture is of the back with the other guest bedroom on the left, the 9' x 20' screened lanai and the master bedroom on the right.
The second picture is of the back with the other guest bedroom on the left, the 9' x 20' screened lanai and the master bedroom on the right.
Wednesday, March 3, 2010
The building material is here
With the foundation poured and drying, the roof trusses, wall lumber and sidewall materials are being delivered.
Tuesday, March 2, 2010
Saturday, February 27, 2010
Ready to pour concrete
All the below grade plumbing and other wiring has been laid and the foundation has been filled and the vapor barrier is in place. All ready for the concrete to be poured.
Thursday, February 25, 2010
Tuesday, February 23, 2010
Foundation is in
Our new neighbor, Harry, has been kind enough to take and email us pictures as our house is built. Two days after we were there, the exterior foundation walls were laid. The shape of the house can be seen. Note that the roof is now on the house next door.
Sunday, February 21, 2010
Work begins
After signing all the papers and spending some fun time with our friends, we stopped by to see our lot one more time before heading back to NC. We were surprised to see that work has already started and the foundation walls had been dug out. This area will be our two guest bedrooms. We're under way!
Wednesday, February 10, 2010
An empty lot
While visiting our friends in The Villages, FL (a 55+ community), we fell in love with the place and bought a new house. This is the first view of the lot we chose which is located in the Village of Hemingway just north of highway 466-A in the south side of The Villages. The house on the right is occupied. The house on the left is under construction as is the one behind us. Two blocks behind us is an adult swimming pool, one block to the right is a golf course and a long block to the left is yet another golf course.